The clean production workshop was completed in October 2013, with a new construction area of 11,000 square meters.It is equipped with 211 sets of equipment such as American Fairhi liquefier, American Dow membrane filtration and purification system, DCS automatic control device, four-effect plate evaporator, open flow and dark tube filter press and automatic filling machine,etc.